So much progress is just 2 days!

We had 1 plasterer, 2 electricians, and 1 Andy (who equals a million people)!

Lounge - plastering 

Urmmmmm, So it turns out we are redoing the lounge as well, this wasn't our initial plan but the plasterer asked if we wanted to do it, so here we are!
Andy has scraped all the wallpaper off and removed the fireplace completely so that he gets the wall ready for the plasterer. This was a huge job as you can see: 
Before

After - outside wall
Wall between lounge and kitchen


The fireplace is resting in the shed for the time being:
Before - the board over the chimney is plasterboard so it can be replastered

After, apparently the bit in red cannot be replastered as it is not plasterboard, so we will have to paint over the wallpaper

There was a vent (hidden under the wallpaper) on the left of the pic above which Andy has sealed up ready for the plasterer to do the walls.

Lounge - electrics

We also have new sockets in here:
New sockets on wall between lounge & kitchen

New sockets on wall between hall & lounge


Kitchen - electrics
So the cabling is in place for the cooker - just needs to be wired in:



Entrance hall  - electrics

They have yet to replace the fuseboard. But, we have a new fused plug for the lights in the hall:

Before - the plug was for the lights in the hall
After, new set up
 The electricians have switched off the electrics upstairs so photos are in the dark.

Entrance hall - plastering
The plasterer is preparing and scraping back the artex on the landing, a big job.
He has removed the shrine!

Top of the stairs - lots of scraping 
Bedroom 1 - plasterer & electrics
You can also see the new socket at the bottom

We have a modified vent in the bedroom: 
Plasterer has made the vent smaller

A brand new ceiling: 
Andy said the plasterer is really meticulous

What is missing in this photo? 
He has taken off the radiator!!! 
The electrician has added 2 double sockets around the bed:
The plasterer had troubles with this wall (below) as he added the glue/bonding and it bubbled. Apparently this might be because of the orange paint so he had to work really hard to scrub back the paint to the wall and start again. 
 
Sockets and scrubbed back wall in bedroom 1
The electrician lifted up the floorboards in the bedroom (1) entrance from the landing: 



Bedroom 2 electrics - they have chased in the cables:

Before
After - chased in alarm electric cable

After - chased in light switch cable


A huge amount of progress and lots of work has been done by Andy, the plasterer and the electricians. 

Tomorrow the electricians are coming at 11am. The plasterer is coming early in the morning to continue.




1 comment:

  1. Exciting!! Exciting for us here following the changes from afar and not getting tired at all. How very lucky to have Andy there paving the way with lotsa hard work, setting the pace AND supervising; a big load off your minds leaving you to concentrate freely at work. And the plasterer and electrician seem to be professionals at their jobs - so important. All you have to do now is to find the $$$!!